4. Assembly and Disassembly Procedures (continued)

S7

Connect cable into inverter board(CN001)

Take an inverter shielding bracket to cover the

inverter board

Use a Phillips-head screwdriver screwed the No.1~6 screws till that inverter shielding bracket and bracket chassis base firmly attached.

(No1~6 screw size=M3x4; Torque=9~10KGFxCM).

4

1

 

CNOO1

5

2

 

 

3

6

 

ACER G24

 

13

Go to cover page

Plug in parallel direction

S8

S9

Connect the FFC cable to the connector of the LCD panel.

Turn the monitor faced down and put it on the bracket chassis module till both parts firmly Connect FFC cable to LCD panel. There are two locks over here when plugging in should be noticed

S10

S11

Angel < 5 degrees

Take lamp cables out from the holes shown as the

photo.

Plug 6 lamp cables to the connectors of inverter

board.

Page 14
Image 14
Acer MB243WABNS service manual S10 S11