4-4 Test Condition

-Circumstance brightness: Dark room less than 2.0 lux.

-Inspection distance: 1.8 m~2.5 m functional inspection.

-Screen size: 60 inches diagonal.

-After repairing each unit, it should be Run-in (refer to the below table).

Symptom

Run-in Time

Normal repair

2 hours

NFF

4 hours

Auto shutdown

6 hours

- Get into Burn-In Mode

 

*Cycle setting is based on the defect symptoms. ie: If it is NFF, the run-in time is 4 hours. You have to set the lamp on for 50 min. and lamp off for 10 min for 4 cycles.

Press power→ left → left → menu on remote controller

Choose Burn In > enter

Lamp On (Min)

Press right key to adjust the time (50)

 

 

Lamp Off (Min)

Press right key to adjust the time (10)

 

 

Set Burning cycle

Press right key to adjust the cycle

 

 

After setting up the time, choose ''Enter into Burn In Mode'' and press "Menu" button.

Screen Defects (While replacing DMD Chip, DMD Board, Main Board)

Frame

< Figure: Zone A, Zone B, Zone C & Frame (as green line) Definition, Active area=Zone A + Zone B >

 

X1161/X1261/X1161A/X1161N/X110/H5360

Confidential

4-

Page 58
Image 58
Acer X110 service manual Test Condition, Nff