Main
Notices
Manual Part Number
Edition
Warrant y
Technology Licenses
Safety and Regulatory Information
Safety Symbols and Instrument Markings
Operator Safety Requirements
Tabl e B Instrument Markings
Tabl e A Safety Symbols (continued)
Page
Page
Page
Page
In This Guide...
Page
Type fac e Conventions
Hardware
Software
Contents
1 Introducing the Agilent 85225F Performance Modeling System
2 Installing the System
3 Verifying System Functionality
4 Servicing the System
A Enhancing Measurement Accuracy
B DC Subsystem Functional Verification Test
Page
1 Introducing the Agilent 85225F Performance Modeling System
Performance Modeling System Configuration Overview
RF and DC Measurement System Configuration
The RF Subsystem
The DC Subsystem
Agilent 4156C Precision Semiconductor Parameter Analyzer
Agilent E5260A 8-Slot High Speed Parametric Measurement Mainframe
The Bias Networks
1
Page
Tabl e 3 Front Panel System Connections, with Agilent 4156C
Page
Tabl e 4 Front Panel System Connections, with Agilent E5260A or E5270B
Page
Tabl e 5 Rear Panel System Connections with Agilent 4156C
NOTE
use the Agilent 4156C HRSMU3 FORCE as the GND (ground u nit).
Page
Tabl e 6 Rear Panel System Connections with Agilent E5260A or E5270B
Page
Page
CV, RF, and DC Measurement System Configuration
The CV Subsystem
Page
Tabl e 7 Front Panel System Connections
Page
Tabl e 8 Rear Panel System Connections
Page
Page
Page
The Low Leakage Switch Mainframe
Page
Page
1/f Noise, CV, RF, and DC Measurement System Configuration
The 1/f Noise Subsystem
Page
Page
Page
Tabl e 1 0 Front Panel System Connections
Page
1
Tabl e 1 1 Rear Panel System Connections
Page
Page
Page
Instrument Control Interface
The LAN/GPIB Gateway
Page
The System Controller
The Rack Cabinet
Performance Characteristics and Specifications
Interference Standards
Performance Modeling System Performance Specifications
RF Subsystem Performance Specifications
DC Subsystem Specifications
Bias Network Characteristics
NOTE
2 Installing the System
To prepare the installation site
Follow these steps to prepare the site for system installation.
To prepare the installation site
Tabl e 16 Environmental Requirements
Tabl e 17 Electrical Requirements
To receive the system
Follow these steps to store, inspect, and confirm the system shipment. To receive the system
To unpack the shipment crate containing the rack cabinet
Required Tools
To unpack the shipment crate containing the rack cabinet (continued)
To v er if y t he shi pm en t
NOTE
Tabl e 18 Replaceable Parts
To verify the shipment (continued)
Page
Page
Page
Page
To install the work surface
Required Tools
To install the work surface (continued)
To ensure your safety while using the system
To ensure your safety while using the system
To ensure your safety while using the system (continued)
Precautions for Performing Floating-Ground Measurements
To perform floating-ground measurements
NOTE
Precautions for Avoiding Electrostatic Discharge
To connect the bias networks
Agilent 4156C Systems
Page
Agilent 4156C Systems with Agilent 41501B Expander Box
To connect the bias networks
Page
Agilent E5260A/70B Systems
To connect the bias networks
Page
Page
To switch on power to the system
NOTE
system components are switched on.
To switch on power to the system
To configure the LAN/GPIB gateway for functional verification
NOTE
Page
3 Verifying System Functionality
To choose a verification process
NOTE
To choose a system verification process (continued)
Understanding the System Functional Verification Test
Performing the System Functional Verification Test
Page
Page
Page
This completes the functional verification procedure.
Page
Page
4 Servicing the System
To troubleshoot the system
To remove or replace a system component
Follow the steps in reverse order to replace a system component.
To remove a system component
To order replacement parts
To receive additional assistance
To package the system for transport
To package the system for transport (continued)
Page
A Enhancing Measurement Accuracy
To enhance measurement accuracy
Page
Understanding System Measurement Calibration
Performing a Coaxial System Measurement Calibration
and the connectors on the bias networks and the semi-rigid cables.
enhance measurement accuracy" on page 112.
To perform the system measurement calibration (continued)
Periodic System Component Calibration
Page
Page
B
Understanding the DC Subsystem Functional Verification Test
For Agilent 4156C subsystems:
For Agilent E5260A/70B DC subsystems:
Performing the DC Subsystem Functional Verification Test
For Agilent 4156C subsystems:
B
For Agilent E5260A/70B DC subsystems:
precision parametric measurement solution service manual.
To perform the Agilent E5260A/70B precision parametric measurement solution self-test
Page
C
Understanding the RF Subsystem Functional Verification Test
Performing the RF Subsystem Functional Verification Test
C
To perform the RF subsystem functional verification test (continued)
Page
Page
Page
D
Understanding the CV Subsystem Functional Verification Test
Performing the CV Subsystem Functional Verification Test
D
Page
E
Understanding the 1/f Noise Subsystem Functional Verification Test
Performing the 1/f Noise Subsystem Functional Verification Test
E
F Understanding the Bias Networks
F
Features
Characteristics
F
Operation
Page
G
Network Analyzer System Performance
Maximum Output Power Dynamic Range
Measurement Port Characteristics
Measurement Uncertainty
Reflection Measurements
Page
Index
Numerics
A
B
C
H
I
L
circuit sharing supply capability
M
T
U
V
procedure, manual
description procedure, remote