Concrete Foundation Installation

A concrete foundation pad may be constructed to elevate the machines. The concrete foundation pad must be poured, reinforced with rebar and tied to the existing floor with reinforcing bars. Refer to Figure 6, Figure 7 or Figure 8 for a typical concrete foundation pad installation.

1.Verify that the floor meets the requirements given in the Machine Foundation section.

2.Excavate the floor to a depth of approximately 9 inches (230 mm) below the floor surface, making certain that the sides of the hole slope outwards from top to bottom. The bottom of the hole should be 6 inches (152 mm) larger all around than the top.

 

WARNING

3. Wet the hole well and brush the bottom and sides

 

 

with cement grout.

To reduce the risk of fire, this appliance must be bolted to an uncovered concrete floor.

 

W731

 

 

 

 

B

 

 

 

 

C

 

A

 

 

 

 

 

D

 

E

 

 

 

 

 

CHM2281N

 

20, 30, 40 AND 60 MODELS

 

 

 

 

CHM2281N

A

Pad height must not exceed 8 in. (203 mm)

D

4 in. (102 mm) minimum

B

above existing floor

 

(2 and F-Speed Models)

.5 in. (13 mm) minimum

 

6 in. (152 mm) minimum (V-Speed Models)

C

4 in. (102 mm) minimum

E

Concrete reinforcing bar