Grounding the Provider Unit
When an
Grounding the chassis requires the following items:
❑One cable lug (provided)
❑One M4 x 8mm screw (provided)
❑Crimping tool (not provided)
❑One 12 AWG stranded wire or 14 AWG solid wire (not provided)
Warning
Make sure to attach the frame to ground before you power on the chassis.
To ground the unit to the ground point, perform the following procedure:
1.Use a crimping tool to affix the provided cable lug to one end of the 12 AWG bundled or 14 AWG solid ground wire.
2.Insert the M4 screw into the cable lug, as illustrated in Figure 16.
Figure 16 Inserting M4 Screw into the Cable Lug
3.Secure the cable lug with the M4 screw to the rear panel of the Provider unit, as illustrated in Figure 17.
Figure 17 Securing Cable Lug with M4 Screw
4.Attach the other end of the ground wire to an appropriate ground (earth) rod of the building.
30