Alto-Shaam 4.10esi manual installation, cT Express checklist, Clearances, water supply and drains

Models: 4.10esi 4.10ESiVH

1 28
Download 28 pages 36.07 Kb
Page 21
Image 21
installation

installation

cT Express™ checklist

Use this list as a final check of oven installation conformance.

Damage directly attributed to improper set up, installation, or cleaning can invalidate warranty claims.

CLEARANCES:

are all CLEARANCE

 

 

Left:

4" (152mm) — Service access of 18" (457mm) recommended.

 

 

Right:

20" (508mm) from heat producing equipment.

requirements met?

YES

NO

4" (102mm)

if no, explain:________________________

Back:

4" (102mm) for plumbing

________________________________________

Top:

20" (508mm) air movement Bottom: 4" (102mm) air movement

 

 

 

 

water supply and drains:

are both water supply lines

 

Verify hook-up to one (1) cold water supply line with a 3/4" (19mm) G

 

water connection supply line. Verify inlet water pressure is at a minimum

properly connected?

YES

NO

of 30 PSI (2.8 bar). Maximum water pressure is not to exceed 90 PSI

 

 

 

(6 bar). Verify drain diameter of 1-1/2" (38mm) with a positive descending

if no, explain:___________________________

slope, and with a 2" (51mm) air gap which is free of obstructions before

is a filter system installed

 

connection to the site drain. Verify 1/8" (3.2mm) pitch to 10' (305cm) of

 

drain line.

on this unit?

YES

NO

important: Alto-Shaam has listed Water Quality Requirements in the

store has seen this

 

 

installation manual for this equipment. It is the responsibility of the end

 

 

user to have the water connected to this appliance tested to ensure these

recommendation:

YES

NO

standards are met before putting the oven into use. Failure to meet these

Signature of Store Representative:

standards will void the warranty if damage to the oven is found to be

related to water quality.

___________________________________________

 

 

 

 

 

 

 

 

 

 

ELECTRICAL CONNECTIONS:

Verify electrical power requirements for oven. Verify voltage at terminal block.

Check all terminals for tightness.

VOLTAGE: ______________

PHASE: ______________

LINE VOLTAGE AT TERMINAL BLOCK (to ground):

LINE 1: _________ LINE 2:_________ LINE 3: _________

LINE VOLTAGE (phase to phase): LINE 1 to 2: __________

LINE 2 to 3: __________

LINE 3 to 1: __________

ELECTRICAL SUPPLY LINE SIZE: ______________

breaker size: ______________

 

ALL ELECTRICAL TERMINALS TIGHT:

YES

NO

 

 

 

 

 

 

 

control board connections & operation:

 

ALL BOARD CONNECTIONS TIGHT:

YES

NO

ExpressTouch: With the Power on, press the Settings Key

ALL FUNCTIONS ARE DISPLAYED:

YES

NO

to access software version.

 

Simple Control: As unit is powered on, software

ALL FUNCTIONS on control OPERATE:

YES

NO

version will appear in the LED display.

 

unit OPERATEs in all modes:

YES

NO

RB_____________

 

if no, explain:_________________________________________

record SOFTWARE VERSION: DB_____________

 

 

 

 

 

 

 

PHYSICAL CONDITION: *r e f e r e n c e i n s t a l l a t i o n i n s t r u c t i o n s f o r c o m p l e t e i n f o r m a t i o n

 

4

Bottom of oven has been checked for damage due to improper positioning on site

 

Verify all gaskets and hoses are in place and function properly

 

Verify the installation of drip pans*, racks, shelves, drain screen, spray hose* .......................................................... cT Express™ checklist

Verify the oven is level and installed on a solid, water resistant surface..................................................................... Use this list as a final check of oven installation conformance.CLEARANCES:

service agency:

model no.:

tech signature:

start-up date:

installation name:

serial no.:

customer signature:

CT Express INSTALLATION MANUAL • 19..

Page 21
Image 21
Alto-Shaam 4.10esi cT Express checklist, Use this list as a final check of oven installation conformance, Clearances