American Panel AP20BC175-2 user manual Starting & Testing The Unit, Spaces Around The Cabinet

Models: AP20BC175-2

1 38
Download 38 pages 7.18 Kb
Page 10
Image 10
SPACES AROUND THE CABINET

AP20BC175-2 Manual

SPACES AROUND THE CABINET

At least 15" clear space is required above the unit for service.

At least 6" clear space is required on both sides of the cabinet.

At least 6" clear space is required on the rear of the cabinet for drain hookup and maintenance.

Enough space should be provided in front of the cabinet to fully open the door.

STARTING & TESTING THE UNIT

1.To charge the unit, use the "HARD" cycle and the "MANUAL" mode. Set for two hours of operation to allow enough time to fully charge the unit.

2.Start the unit per 1. above and in accordance with the following operating instructions, then perform at least one complete blast chilling or shock freezing cycle. When done, instruct the client on the correct use of the unit.

3.By the end of the cycle the unit should have pulled down to10 o F. It should have been cycling between 10o F and 20o and the sight glass must be clear.

4.As soon as possible after the unit has been started, check the power consumption, the standard pressure measurements and the operation of all the controls.

NOTE: The refrigerating system works on pressure. An electro valve mounted on the top of the cabinet is controlled by the electronic controller. When the temperature of the air in the cabinet falls to the programmed low temp setting, the electro valve will close (0 VAC) and the unit will pump down. When the temperature of the air in the cabinet rises to the programmed high temp setting, the electro valve will open and refrigeration will start.

9

Page 10
Image 10
American Panel AP20BC175-2 user manual Starting & Testing The Unit, Spaces Around The Cabinet