INDEX |
| |
INTRODUCTION | 3 | |
CONTROLLER FEATURES | 3 | |
OPERATING MODES | 3 | |
AUTOMATIC MODE | 3 | |
MANUAL MODE | 3 | |
OPERATING CYCLES | 4 | |
ADDITIONAL CYCLES | 4 | |
PRINTER | 4 | |
PC CONNECTION (OPTIONAL) | 4 | |
INSTALLATION OF REMOTE UNITS | 5 | |
REQUIREMENTS TO BE MET DURING INSTALLATION (8 STEPS) | 5 | |
INSTALLATION AT THE SAME LEVEL | 5 | |
INSTALLATION AT DIFFERENT LEVELS | 6 | |
CONNECTION PIPING FOR REMOTE CONDENSING UNITS | 6 | |
INSTALLATION | 7 | |
WARNINGS | 7 | |
PREPARATION | 7 | |
INSTALLATION | 7 | |
LOCATION | 7 | |
DIMENSIONS | 7 | |
ELECTRICAL AND REFRIGERATION SPECIFICATIONS | 7 | |
CONNECTION TO THE REMOTE UNIT | 8 | |
CONDENSATE DRAINAGE CONNECTION | 8 | |
VERIFYING CORRECT INSTALLATION | 8 | |
SPACES AROUND THE CABINET | 9 | |
STARTING & TESTING THE UNIT | 9 | |
USING THE HURRICHILL™ TECHNOLOGY | 10 | |
BLAST CHILLING | 10 | |
SHOCK FREEZING | 10 | |
SOFT CHILL CYCLE | 10 | |
HARD CHILL CYCLE | 10 | |
SHOCK FREEZE CYCLE | 10 | |
PANNING AND LOADING | 11 | |
PANNING | 11 | |
LOADING | 11 | |
CONTROL PANEL FOR MODEL | 12 | |
KEYBOARD KEYS | 13 | |
KEY COMBINATIONS | 13 | |
PROGRAMMING | 14 | |
1. INITIAL PROGRAMMING | 14 | |
2. PROGRAMMING THE CYCLES | 17 | |
AUTOMATIC SOFT CYCLE PARAMETERS PROGRAMMING | 17 | |
AUTOMATIC HARD CYCLE PARAMETERS PROGRAMMING | 18 | |
DEFROST CYCLE PARAMETERS PROGRAMMING | 19 |
1