External Connection

4.9.2 APC Battery Breaker Box Connection Diagram

Battery 1

Battery 2

UPS Battery 1

UPS Battery 2

Main cables are connected directly to component terminals

X009 LED signal from UPS “OK to operate corresponding MCCB”

X010 MCCB position signals for UPS

X011 Trip for emergency stop (220-240V AC)

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

33

Page 33
Image 33
American Power Conversion 240-320kW 400V manual APC Battery Breaker Box Connection Diagram