Options/Accessories

H002a

6.2.5 Switching Back to Normal Parallel/Redundant Operation

1.Turn input switch (Q001) and output switch (Q002) to position “1”

2.Charge capacitor, connect battery and start up UPS

UPS will automatically switch to normal operation and start load-sharing with other parallelled UPS(s).

WARNING!

System will discharge built-in capacitors, but check terminal voltage before proceding.

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

55

Page 55
Image 55
American Power Conversion 240-320kW 400V manual Switching Back to Normal Parallel/Redundant Operation