Options/Accessories

6.2.3 Operating External Service Bypass Switch for Parallel Systems

6.2.3.1 Bypassing Parallel UPS Systems

H002a

CAUTION!

Batteries connected to a UPS out of service for a period exceeding 8 days may be damaged.

990-4045a

50

Installation Guide APC Silcon 240-320kW 400V UPS

Page 50
Image 50
American Power Conversion 240-320kW 400V manual H002a