3.0 Installation

3.1 Requirements on Site

All system parts are accessible from front or top of UPS. Cable entries are accessible from
bottom. A 1-metre free space on all sides should be allowed during installation.
After installation of the UPS, leave a free space of 600 mm to the right for system access.
(As per applicable national and/or local codes.)
For ventilation and service purposes allow for free space of minimum 1m above the unit or per
national and/or local codes and in front of UPS. Never install systems in direct sunlight.
3.1.1 Cabinet Dimensions
Cabinet
NOTICE!
For reliability reasons do not stand on the UPS. Keep the UPS cabinet surface free of any
objects.
UPS Height [mm] Width [mm] Depth [mm]
240kW 1800 1600 800
320kW 1800 1600 800
APC isolation
Transformer Module
120-240kW
800 mm wide
1800 mm
240-320kW
1600 mm wide
1800 mm