Installation

3.0Installation

3.1Requirements on Site

All system parts are accessible from front or top of UPS. Cable entries are accessible from bottom. A 1-metre free space on all sides should be allowed during installation. After installation of the UPS, leave a free space of 600 mm to the right for system access. (As per applicable national and/or local codes.)

For ventilation and service purposes allow for free space of minimum 1m above the unit or per national and/or local codes and in front of UPS. Never install systems in direct sunlight.

NOTICE!

For reliability reasons do not stand on the UPS. Keep the UPS cabinet surface free of any objects.

3.1.1 Cabinet Dimensions

UPS

Height [mm]

Width [mm]

Depth [mm]

 

 

 

 

240kW

1800

1600

800

 

 

 

 

320kW

1800

1600

800

 

 

 

 

Cabinet

1600 mm wide

1800 mm

240-320kW

800 mm wide

 

?

1800 mm

1800 mm

 

 

 

 

 

 

 

 

APC isolation Transformer Module

240kW

1600 mm wide

?

APC Isolation

Transformer Module

320kW

 

990-4056

 

 

Installation Guide APC Silcon 240-320kW 400V UPS

5

Page 5
Image 5
American Power Conversion AP9604S manual Installation, Requirements on Site, Height mm Width mm Depth mm