American Power Conversion S15BLK Performing the System Test, Powering On and Connecting Equipment

Models: S15BLK

1 52
Download 52 pages 49.04 Kb
Page 25
Image 25

Powering On and Connecting Equipment

1.Power on the S10/S15 unit.

2.Connect the equipment.

3.Connect the data line cables.

4.Power on the connected equipment.

Performing the System Test

Before connecting equipment to the S10 or S15 Power Conditioner with Battery Backup, ensure that the unit is functional by connecting the AC Power Cord (provided) at the rear panel. Press the front panel power switch. Once power is applied to the unit, the display provides the information screens shown in Figures 7 through 15, and defined as follows:

APC - LEGENDARY RELIABILITY screen — this screen, shown in Figure 7, indicates that the unit has power and is functioning.

Figure 7. APC - LEGENDARY RELIABILITY Screen

Model Identification screen – the message displayed in Figure 8 indicates that the proper firmware was installed for the model purchased.

2-5

Page 25
Image 25
American Power Conversion S15BLK owner manual Performing the System Test, Powering On and Connecting Equipment