1.With the top covers removed, drill holes for AC, PE and Battery grommets in areas shown.
2.
3.Feed AC and PE cables through grommets in the Control/Input/Output Section.
Hole distance DC  | 
  | 
Cable lug  | Busbar  | 
44.45 mm  | 44.45 mm  | 
35.8 mm  | fl 13  | 
  | 
Hole distance AC | 
  | 
Cable lug  | Busbar  | 
44.45 mm  | 44.45 mm  | 
58 mm  | fl 13  | 
  | 
Hole distance grounding  | 
  | 
Cable lug  | Busbar  | 
44.45 mm  | 44.45 mm  | 
46.99 mm  | M10 stud  | 
4.Connect PE cable.
5.Connect AC IN cables to normal power and bypass power.
6.Connect AC OUT cables.
Battery cables connection
Warning: Make sure that the battery breakers are open (OFF) prior to running the cables.
Caution: For battery installation and maintenance instructions, refer to the battery manufacturer’s installation manual.
Caution: 
Note: 
8  | Symmetra MW II 1200 kW 3 x 400/230 V Installation -   |