Top cable entry
Top view of top cover
|
|
| | |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Top view of input and output
|
UPS Summary | NormalNormal |
~ | ~ |
|
|
![]()
![]()
L1 IN
L1 OUT![]()
L2 IN | L2 OUT | L3 IN | L3 OUT |
| L1 IN | L2 IN | L3 IN |
| L1 OUT | L2 OUT | L3 OUT |
Side view of PE![]()
busbar.
1. Loosen the 8 bolts to remove top cover.
Note: No drilling or cutting should take place over the top of the UPS.
2.Drill holes for grommets.
3.
4.Feed the cables through the grommets. Connect cables at cable connection points.
5.Connect Protective Earth conductor to busbar locations.
Symmetra MW II 1200 kW 3 x 400/230 V Installation - | 11 |