9Symmetra MW II 1200 kW 3 x 400/230 V Installation - 990-1979E-001

1. Feed the battery cables through the grommets.

2. Connect battery cables to Bat 1+ and Bat 1-.

3. Connect battery cables to Bat 2+ and Bat 2-.

Note:The battery cables can be connected on either side of the busbar.