Step A: configure your target

7.Gigabit LAN switches. (Recommended) or Gigabit LAN switches with VLAN/LACP/Trunking functions. (Optional)

8.CHAP security information, including CHAP usernames and secrets. (Optional)

9.Setup the hardware connection before power up servers and IS16GL. Connect console cable, management port cable, SCSI cables, terminators, and iSCSI data port cables first.

Step A: configure your target

1. Go to \Volume config\Volume group, create a VG.

Figure H.1: create VG.

Figure H.2: choose RAID level and disks.

Figure H.3: confirm VG settings.

- 123 -

Page 123
Image 123
APC SCSI-SATA II manual Step A configure your target