![](/images/backgrounds/108845/108845-369x1.png)
Figure 5
1.Grease underside of discharge chute ring (if not already greased).
2.Remove mounting hardware from the bottom of the chute pedestal.
3.Install discharge chute over opening in the auger housing and secure pedestal to auger housing with hardware removed in step 2.
|
| |
|
| |
1. | Mounting Hardware |
|
2. | Discharge Chute |
|
3. | Discharge Chute Ring |
|
4. | Chute Pedestal | OS2025 |
| Figure 5 | |
| OS2026 |
Figure 6
The battery connectors are located under the battery cover. To connect batteries:
1.Ensure that the power and PTO switches are in the OFF position.
2.Remove two hex socket head screws from each side of battery cover. Use hex key provided in literature pack.
3.Rotate cover toward handlebar. Use care not to place tension on wires.
4.Connect two batteries to power harness leads. Ensure that connectors are fully seated and lock in place.
1 | |||
|
|
1. | Battery Connectors | |
2. | Power Harness Connectors | |
3. | Front Battery |
|
4. | Rear Battery |
|
| Figure 6 |
|
5.Install battery cover. To prevent damage to cover do not overtighten hex socket head screws.
WARNING: ALWAYS disconnect the batteries before performing maintenance on unit.
IMPORTANT: Both batteries must be disconnected to fully remove power from the electrical system.
IMPORTANT: Battery cover also acts as the
Figure 7
1.Slide chute crank through the opening in the control panel.
NOTE: Be careful not to damage nylon bushing when attaching crank to the dash.
2.Connect the chute crank to the pinion gear on chute with spring clip pin.
GB - 9