Body Solid G6B manual Pec Dec Cable, One 50 3/8 x 1 hex head bolt One 71 3/8 nylon lock nut

Models: G6B

1 90
Download 90 pages 16.99 Kb
Page 36
Image 36

S T E P

14

Be careful to assemble all components in the sequence they are presented.

Pec Dec Cable (88)

Stamped Eye End

Stamped Eye End

2055 mm

6’ 9”

 

 

NOTE:

Leave all pulley bolts hand tight until step 15

A.Bolt Pec Dec Cable (88) to Left Pec Dec Cam (P) as shown in diagram 1 using:

One 50 (3/8” x 1” hex head bolt) One 71 (3/8” nylon lock nut)

B.See diagram 1. Route Cable (88) through Pulley Swivel (AC) on the left side, hold cable in place with Pulley (C1) using:

One 51 (3/8” x 1 3/4” hex head bolt) Two 74 (3/8” washer)

One 71 (3/8” nylon lock nut)

C.See diagram 1. Route Cable (88) up and into 90 Degree Double Pulley Holder (CC) and install Pulley (C2) using:

One 51 (3/8” x 1 3/4” hex head bolt) Two 74 (3/8” washer)

One 71 (3/8” nylon lock nut)

B.Insert Cable (88) through Pulley Swivel (AC) on the right side, hold cable in place by installing Pulley (C3) as shown in diagram 2 using:

One 51 (3/8” x 1 3/4” hex head bolt) Two 74 (3/8” washer)

One 71 (3/8” nylon lock nut)

C.Attach Cable (88) to Right Pec Dec Cam (S) as shown in diagram 1 using:

One 50 (3/8” x 1” hex head bolt) One 71 (3/8” nylon lock nut)

mm

Inch

36

Page 36
Image 36
Body Solid G6B manual Pec Dec Cable, One 50 3/8 x 1 hex head bolt One 71 3/8 nylon lock nut