22 en Hardware InstallationRAID Subsystem
3.3 | General Installation Procedure | ||||||
| The following instructions can save installation time. Detailed, illustrated instructions for each | ||||||
| component are given in the following sections. | ||||||
|
|
|
|
|
| ||
| CAUTION! |
|
| ||||
| To ensure that your system is correctly installed, please follow the steps outlined below. If you | ||||||
| follow these steps, installation will be fast and efficient. If you do not follow these steps, you | ||||||
| may have incorrectly installed the hardware. | ||||||
|
|
|
|
|
| ||
| 1. | Unpack: Unpack the subsystem and confirm that all the components on the Unpacking | |||||
|
| Checklist have been included. |
|
| |||
| 2. | Rack/Cabinet installation: If the subsystem is going to be installed in a rack or cabinet, it | |||||
|
| should be installed prior to installing the hard drives. Installing the subsystem into a rack | |||||
|
| or cabinet requires at least two (2) people. | |||||
| 3. | Install drive trays: After the hard drives have been installed into the drive trays, the drive | |||||
|
| trays must be installed into the enclosure itself. (See Section 3.6 Drive Tray Installation) | |||||
| 4. Cable connection: Use the power cords that came with the subsystem to connect the | ||||||
|
| subsystem to the main power source. Use | |||||
|
| ports to servers. |
|
| |||
| 5. | Power up: Once the components have been properly installed and all cables are properly | |||||
|
| connected, you can power up the subsystem and configure the RAID array. (See | |||||
|
| Section 5.4 Power On) |
|
| |||
3.3.1 | Installation Procedure Flowchart | ||||||
| Table 3.1 shows a flowchart of the installation procedure. As you complete each step, check | ||||||
| off the “Done” box on the right. Please use this flowchart in conjunction with the instructions | ||||||
| that follow. |
|
| ||||
|
|
|
|
|
|
| |
| Step |
| Installation Procedure |
| Done |
| |
|
|
|
|
|
|
|
|
|
| 1 |
| Unpack |
|
| See Section 3.4 Unpacking the Subsystem |
|
|
|
|
|
|
|
|
|
| 3 |
| Rack/Cabinet Installation |
|
| See Section 3.5 Rackmounting |
|
|
|
|
|
|
|
|
|
| 5 |
| Drive Tray Installation |
|
| See Section 3.6 Drive Tray Installation |
|
|
|
|
|
|
|
|
|
| 6 |
| Cable Connection |
|
|
|
|
|
|
|
|
|
|
|
|
| 7 |
| Power On |
|
| See Section 5.4 Power On |
|
|
|
|
|
|
| |
| Table 3.1 | Installation Procedure Flowchart |
|
| |||
3.4 | Unpacking the Subsystem |
i
Use the unpacking checklist in your package to check packing contents. Carefully check the items contained in each box before proceeding with installation.
NOTICE!
A detailed packing list can be found in your product shipping package or product CD.
F.01U.027.797 V2 2008.08 | Bosch Security Systems |