General Installation Procedure

22 en Hardware InstallationRAID Subsystem DVA-08K Installation Manual

3.3

General Installation Procedure

 

The following instructions can save installation time. Detailed, illustrated instructions for each

 

component are given in the following sections.

 

 

 

 

 

 

 

CAUTION!

 

 

 

To ensure that your system is correctly installed, please follow the steps outlined below. If you

 

follow these steps, installation will be fast and efficient. If you do not follow these steps, you

 

may have incorrectly installed the hardware.

 

 

 

 

 

 

 

1.

Unpack: Unpack the subsystem and confirm that all the components on the Unpacking

 

 

Checklist have been included.

 

 

 

2.

Rack/Cabinet installation: If the subsystem is going to be installed in a rack or cabinet, it

 

 

should be installed prior to installing the hard drives. Installing the subsystem into a rack

 

 

or cabinet requires at least two (2) people.

 

3.

Install drive trays: After the hard drives have been installed into the drive trays, the drive

 

 

trays must be installed into the enclosure itself. (See Section 3.6 Drive Tray Installation)

 

4. Cable connection: Use the power cords that came with the subsystem to connect the

 

 

subsystem to the main power source. Use self-purchased SCSI cable to connect host

 

 

ports to servers.

 

 

 

5.

Power up: Once the components have been properly installed and all cables are properly

 

 

connected, you can power up the subsystem and configure the RAID array. (See

 

 

Section 5.4 Power On)

 

 

3.3.1

Installation Procedure Flowchart

 

Table 3.1 shows a flowchart of the installation procedure. As you complete each step, check

 

off the “Done” box on the right. Please use this flowchart in conjunction with the instructions

 

that follow.

 

 

 

 

 

 

 

 

 

 

Step

 

Installation Procedure

 

Done

 

 

 

 

 

 

 

 

 

 

 

1

 

Unpack

 

 

See Section 3.4 Unpacking the Subsystem

 

 

 

 

 

 

 

 

 

 

3

 

Rack/Cabinet Installation

 

 

See Section 3.5 Rackmounting

 

 

 

 

 

 

 

 

 

 

5

 

Drive Tray Installation

 

 

See Section 3.6 Drive Tray Installation

 

 

 

 

 

 

 

 

 

 

6

 

Cable Connection

 

 

 

 

 

 

 

 

 

 

 

 

 

7

 

Power On

 

 

See Section 5.4 Power On

 

 

 

 

 

 

 

 

Table 3.1

Installation Procedure Flowchart

 

 

3.4

Unpacking the Subsystem

i

Use the unpacking checklist in your package to check packing contents. Carefully check the items contained in each box before proceeding with installation.

NOTICE!

A detailed packing list can be found in your product shipping package or product CD.

F.01U.027.797 V2 2008.08

Bosch Security Systems

Page 22
Image 22
Bosch Appliances DVA-08K General Installation Procedure, Unpacking the Subsystem, 3.3.1, Installation Procedure Flowchart