Bosch Appliances DVA-08K manual

Models: DVA-08K

1 68
Download 68 pages 6.26 Kb
Page 49
Image 49
7.Insert the new PSU module into the subsystem: Once the previously removed cooling module has been installed, insert the new PSU module into the subsystem. Make sure the extraction lever is in its downright position so that the saddle notches on the lower edges of the handle can lock on to the edge metal brackets along the chassis inner walls. Push the PSU into the slot and pull the handle upwards to secure the module.

RAID Subsystem DVA-08K Installation Manual

Subsystem Maintenance en 49

 

 

7.Insert the new PSU module into the subsystem: Once the previously removed cooling module has been installed, insert the new PSU module into the subsystem. Make sure the extraction lever is in its downright position so that the saddle notches on the lower edges of the handle can lock on to the edge metal brackets along the chassis inner walls. Push the PSU into the slot and pull the handle upwards to secure the module.

8.Reinsert the retention screw: If the PSU module is properly installed, the back end of the module should be aligned with the enclosure’s rear panel. To firmly secure the PSUs into place, reinsert the retention screw.

9.Reconnect the power cord and turn the power on: Plug the power cord into the socket on the PSU module and turn the PSU module power switch on.

Bosch Security Systems

F.01U.027.797 V2 2008.08

Page 49
Image 49
Bosch Appliances DVA-08K manual