Assembly Guide |
|
| |
Step 10 - Attach the Leg Extension Pivot Tube | Figure 10a | G | Bracket |
|
|
| |
Locate the following items: | N |
|
|
|
|
| |
• Item #13 - Leg Extension Pivot Tube |
|
| O |
|
|
| |
• From Step 9 - Main Assembly |
|
|
|
• Item #30 - Lock Out Pin |
|
|
|
• Item #G - (1) 3/8" X 2 3/4" Button Head Screw | “Curve” |
|
|
|
|
| |
• Item #N - (2) 3/8" Washers |
|
|
|
• Item #O - (1) 3/8" Nylock Nut |
|
|
|
• Item #Q - (1) Bolt Cover |
|
|
|
| 13 |
|
|
Undo the twist ties from the Pivot Bushings. Align the holes |
|
|
|
located on the“curve” of the Leg Extension PivotTube (Item #13) |
|
|
|
with the holes on the bracket of the Rear Leg, as shown in Figure |
|
| Rear Leg |
|
|
| |
10a. |
|
|
|
Place (1) 3/8" Washer (Item #N) over the end of (1) 3/8" |
|
|
|
X 2 3/4" Button Head Screw (Item #G). Thread the |
|
|
|
screw through the aligned holes and bushings and secure |
|
|
|
by placing (1) 3/8" Washer and (1) 3/8" Nylock Nut (Item |
|
|
|
#O) over the end of the screw, as shown in Figure 10a. |
|
|
|
Do not | Figure 10b |
|
|
|
|
|
Place (1) Bolt Cover (Item #Q) over the Nylock Nut installed during Step 10.
Holes
Note: When storing the Rail Assembly, insert the Lock Out Pin (Item #30) through the holes in the Pivot Tube to temporarily hold the Leg Extension in place while folding the Rail up (see Figure 10b).
30
Leg Extension