Assembly Guide
Step 3 - Attach the Squat Platform to the Main Assembly
Locate the following items:
•From Step 2 - Base Platform/Lat Tower (Main) Assembly
•Item #5 - Squat Platform
•Item #I - (2) 3/8" X 3 1/4" Button Head Screws
•Item #N - (4) 3/8" Washers
•Item #O - (2) 3/8" Nylock Nuts
•Item #Q - (4) Bolt Covers
With the Base Frame/Lower Lat Tower (Main)
Assembly (from Step 2) on the floor, carefully lift up the front of the unit, then slide the Squat Platform (Rubber- pad side down) underneath both Legs.
Line up the bolt holes in the brackets on the Squat Platform with the bolt holes on each Leg (directly behind the pulleys), as shown in Figure 3a.
Place (2) 3/8" Washers (Item #N) over the ends of (2) 3/8" X 3 1/4" Button Head Screws (Item #I) - one washer per screw. Insert the screws through the
Completely tighten hardware installed during Step 3.
Place (2) Bolt Covers (Item #Q) over the Nylock Nuts installed in this step - one cover per nut. Then, place (2) additional Bolt Covers over the
Figure 3a
Base Platform/Lower
Lat Tower Assembly
O
N
IBolt
Holes
Leg
5
Squat
Platform
Brackets
Figure 3b
Q