TM

SLE100 Installation Manual

5.Next, connect the interface labeled “Data” on the PoE Injector to the network device that will interface with the SLE100.

6. Connect the site ground to the terminal labeled “GND” on the PoE Injector.

7.Connect the DC plug end of the Power Supply to the receptacle labeled “PWR” on PoE Injector.

20

590-00532, rev A

Page 25
Image 25
BridgeWave installation manual SLE100 Installation Manual