Bryant 120 Removing Bottom Closure Panel, Leveling Legs If Desired, Bottom Return Air Inlet, 312A

Models: 120

1 58
Download 58 pages 26.3 Kb
Page 11
Image 11
Fig. 9 - Removing Bottom Closure Panel

A02098

Fig. 9 - Removing Bottom Closure Panel

Leveling Legs (If Desired)

In upflow position with side return inlet(s), leveling legs may be used. (See Fig. 10.) Install field-supplied, 5/16 X 1-1/2 in. (max) corrosion-resistant machine bolts, washers and nuts.

NOTE: Bottom closure must be used when leveling legs are used. It may be necessary to remove and reinstall bottom closure panel to install leveling legs. To remove bottom closure panel, see item 1 in Bottom Return Air Inlet section in Step 1 above.

To install leveling legs:

1.Position furnace on its back. Locate and drill a hole in each bottom corner of furnace. (See Fig. 10.)

2.For each leg, install nut on bolt and then install bolt and nut in hole. (Install flat washer if desired.)

3.Install another nut on other side of furnace base. (Install flat washer if desired.)

4.Adjust outside nut to provide desired height, and tighten inside nut to secure arrangement.

5.Reinstall bottom closure panel if removed.

516

516

1 34

1 34

516

516

134

134Leveling Legs (If Desired)

A02071

Fig. 10 - Leveling Legs

DOWNFLOW INSTALLATION

NOTE: For downflow applications, this furnace is approved for use on combustible flooring when any one of the following 3 accessories are used:

SSpecial Base, KGASB

SCased Coil Assembly Part No. CD5 or CK5 S Coil Box Part No. KCAKC

1.Determine application being installed from Table 4.

2.Construct hole in floor per Table 4 and Fig. 11.

3.Construct plenum to dimensions specified in Table 4 and Fig. 11.

4.If downflow subbase, KGASB is used, install as shown in Fig. 12. If Coil Assembly Part No. CD5 or CK5 or Coil Box Part No. KCAKC is used, install as shown in Fig. 13.

NOTE: It is recommended that the perforated supply-air duct flanges be completely folded over or removed from furnace when installing the furnace on a factory-supplied cased coil or coil box. To remove the supply-air duct flange, use wide duct pliers or hand seamers to bend flange back and forth until it breaks off. Be careful of sharp edges. (See Fig. 14.)

Bottom Return Air Inlet

These furnaces are shipped with bottom closure panel installed in bottom return-air opening. Remove and discard this panel when bottom return air is used. To remove bottom closure panel, perform the following:

1.Tilt or raise furnace and remove 2 screws holding bottom filler panel. (See Fig. 9.)

2.Rotate bottom filler panel downward to release holding tabs.

3.Remove bottom closure panel.

4.Reinstall bottom filler panel and screws.

HORIZONTAL INSTALLATION

The furnace can be installed horizontally in an attic or crawl space on either the left-hand (LH) or right-hand (RH) side. The furnace can be hung from floor joists, rafters or trusses or installed on a non-combustible platform, blocks, bricks or pad.

!WARNING

FIRE, EXPLOSION, AND CARBON MONOXIDE POISONING HAZARD

Failure to follow this warning could result in personal injury, death, or property damage.

Do not install the furnace on its back or hang furnace with control compartment facing downward. Safety control operation will be adversely affected. Never connect return-air ducts to the back of the furnace.

Suspended Furnace Support

The furnace may be supported under each end with threaded rod, angle iron or metal plumber’s strap as shown. (See Fig. 15 and 16.) Secure angle iron to bottom of furnace as shown. Heavy-gauge sheet metal straps (plumber’s straps) may be used to suspend the furnace from each bottom corner. To prevent screws from pulling out, use 2 #8 x .-in. screw into the side and 2 #8 x .-in. screw in the bottom of the furnace casing for each strap. (See Fig. 15 and 16.)

If the screws are attached to ONLY the furnace sides and not the bottom, the straps must be vertical against the furnace sides and not pull away from the furnace sides, so that the strap attachment screws are not in tension (are loaded in shear) for reliable support.

Platform Furnace Support

Construct working platform at location where all required furnace clearances are met. (See Fig. 2 and 17.) For furnaces with 1-in. clearance requirement on side, set furnace on non-combustible blocks, bricks or angle iron. For crawlspace installations, if the furnace is not suspended from the floor joists, the ground

312A

11

Page 11
Image 11
Bryant 120 Removing Bottom Closure Panel, Leveling Legs If Desired, Leveling Legs DOWNFLOW INSTALLATION, 312A