Bryant 120 instruction manual Checklist, 312A

Models: 120

1 58
Download 58 pages 26.3 Kb
Page 41
Image 41
Step 5 — Checklist

Step 5 — Checklist

1.Put away tools and instruments. Clean up debris.

2.Verify that switches for LHT and OFF-DELAY are blower OFF-DELAY are selected as desired.

3.Verify that blower and burner access doors are properly installed.

4.Cycle test furnace with room thermostat.

5.Check operation of accessories per manufacturer￿fs instructions.

6.Review User’s Guide with owner.

7.Attach literature packet to furnace.

312A

41

Page 41
Image 41
Bryant 120 instruction manual Checklist, 312A