Bunn LCC-2 service manual Initial Fill & Heat

Models: LCC-2

1 26
Download 26 pages 22.61 Kb
Page 10
Image 10
INITIAL FILL & HEAT

INITIAL FILL & HEAT

1.Select Normal on the Function Selector Switch and Run on the Mode Selector Switch.

2.Confirm the water supply is on.

3.Connect the dispenser to the power source. The Red POWER LED will illuminate and water will begin flowing into the tank. The dispenser will automatically stop filling when the tank is full. The dispenser will not begin heating the water until after the tank is filled. Dispenser models with product chillers will begin to cool the cabinet at this time.

4.The Green READY LED will illuminate when the tank temperature reaches the preset ready temperature.

3 4

Manual background 1

10

39288 083106

 

Page 10
Image 10
Bunn LCC-2 service manual Initial Fill & Heat