Bunn LCC-2 service manual Installing Pump Tubing, Installing The Pump Tubing

Models: LCC-2

1 26
Download 26 pages 22.61 Kb
Page 9
Image 9
INSTALLING PUMP TUBING

INSTALLING PUMP TUBING

INSTALLING THE PUMP TUBING

Refer to the Tube Replacement Instruction inside the Cabinet door.

1.Loosen the thumbscrew securing the tubing retainer plate to the pump body and set the retainer plate aside.

2.Depress the tension screw and remove it from the notch in the pump body, releasing the spring tension on the pump band.

3.Apply lubricant (BUNN-O-MATIC part no. M2531.0001) to the middle section of the new pump tubing.

4.Carefully wrap the new tubing around the rotor, making sure that the elbow and clamps end up on the front side of the pump body.

5.Depress the tension screw and insert it in the notch in the pump body, reapplying spring tension on the pump band.

6.Install the free end of the tube over the inlet port of the mix chamber on that side of the cabinet.

7.Replace the tubing retainer plate and tighten the thumbscrew.

8.Attach the BIB adapter to the tubing and connect to the opened product container.

9.Repeat steps 1 through 8 for the other pump.

10.Prime the pumps. Refer to Priming the Concentrate Lines section.

Note: Replacement Tube Kits can be purchased from BUNN-O-MATIC.

Retaining

Thumbscrew

Tension

Plate

Screw

 

INSTALLING THE PUMP TUBING2.0”

Manual background 2.0”

 

 

 

Lubricate between arrows

Remove Retaining Plate

Release Spring Tension

Remove Tubing

Lubricate New Tube

Inlet Port

Elbow &

Clamps

Install New Tubing

Completed Installation

9

39288 083106

 

Page 9
Image 9
Bunn LCC-2 service manual Installing Pump Tubing, Installing The Pump Tubing