INSTALLING PUMP TUBING
INSTALLING THE PUMP TUBING
Refer to the Tube Replacement Instruction inside the Cabinet door.
1.Loosen the thumbscrew securing the tubing retainer plate to the pump body and set the retainer plate aside.
2.Depress the tension screw and remove it from the notch in the pump body, releasing the spring tension on the pump band.
3.Apply lubricant
4.Carefully wrap the new tubing around the rotor, making sure that the elbow and clamps end up on the front side of the pump body.
5.Depress the tension screw and insert it in the notch in the pump body, reapplying spring tension on the pump band.
6.Install the free end of the tube over the inlet port of the mix chamber on that side of the cabinet.
7.Replace the tubing retainer plate and tighten the thumbscrew.
8.Attach the BIB adapter to the tubing and connect to the opened product container.
9.Repeat steps 1 through 8 for the other pump.
10.Prime the pumps. Refer to Priming the Concentrate Lines section.
Note: Replacement Tube Kits can be purchased from
Retaining | Thumbscrew | Tension | |
Plate | Screw | ||
|
2.0”
2.0”
|
|
| Lubricate between arrows |
Remove Retaining Plate | Release Spring Tension | Remove Tubing | Lubricate New Tube |
Inlet Port
Elbow &
Clamps
Install New Tubing | Completed Installation |
9 | 39288 083106 |
|