Bunn LCC-2 service manual Preventive Maintenance, Replacing The Pump Tubing

Models: LCC-2

1 26
Download 26 pages 22.61 Kb
Page 19
Image 19
PREVENTIVE MAINTENANCE

PREVENTIVE MAINTENANCE

Bunn-O-Matic®Corporation recommends that preventive maintenance be performed at regular intervals. Maintenance should be performed by a qualified service technician. For Technical Service, contact Bunn-O-Matic®Corporation at 1-800-286-6070.

NOTE: Replacement parts or service caused by failure to perform required maintenance is not covered by warranty. Replace pump hoses every 6-Months or as needed.

REPLACING THE PUMP TUBING

The pumps and tubing used in the dispenser are designed to give maximum performance and long life. However, the tubes are a wear item and must be replaced periodically. How long the tubes last is dependent on usage and properties of the concentrate. Excessive wear will reduce the output of the pumps resulting in a weak mixed beverage. Bunn-O-Matic recommends replacing the Pump Tubing a minimum of once every 6 months or sooner if warranted.

Refer to the Tube Replacement Instruction inside the Cabinet door.

Note: To avoid concentrate spills, rinse the pump tubing with warm tap water prior to removing the tubes, (Refer to steps 1 - 4 of the Weekly Sanitizing instructions).

1.Loosen the thumbscrew (Fig 1) securing the tubing retainer plate to the pump body and set the retainer plate aside.

2.Depress the tension screw and remove it from the notch in the pump body, releasing the spring tension on the pump band (Fig 2).

3.Gently pull the pump tube from around the pump rotor (Fig 3).

4.Inspect the pump bands, rollers and housing for contamination or signs of wear. Clean or replace worn parts if neces- sary.

5.Apply lubricant (BUNN-O-MATIC part no. M2531.0001) to the middle section of the new pump tubing (Fig 4).

6.Carefully wrap the new tubing around the rotor, making sure that the elbow and clamps end up on the front side of the pump body (Fig 5).

7.Depress the tension screw and insert it in the notch in the pump body, reapplying spring tension on the pump band.

8.Install the free end of the tube over the inlet port of the mix chamber on that side of the cabinet (Fig. 5).

9.Replace the tubing retainer plate and tighten the thumbscrew.

10.Attach the BIB adapter to the tubing and connect to the opened product container (Fig 6).

11.Repeat steps 1 through 10 for the other pump.

Note: Replacement Tube Kits can be purchased from BUNN-O-MATIC.

Fig 1

Fig 2

Fig 3

Fig 4

Retaining

Thumbscrew

Tension

Plate

Screw

 

REPLACING THE PUMP TUBING2.0”

Manual background 2.0”

 

 

 

Lubricate between arrows

Remove Retaining Plate

Release Spring Tension

Remove Tubing

Lubricate New Tube

 

Fig 5

 

Fig 6

 

Inlet Port

 

 

 

Elbow &

 

 

 

Clamps

 

 

Install New Tubing

Completed Installation

19

39288 031010

 

Page 19
Image 19
Bunn LCC-2 service manual Preventive Maintenance, Replacing The Pump Tubing