Figure 4 | Front Support Leg |
|
|
Apply Grease At Contact Points
7.Fasten curtain frame upright bracket to gear- box using (3) 12 x 30mm bolts, and (1) 12 x 40mm bolt. The 12 x 40mm bolt is located in the bottom rear hole. Leave this bolt loose as it will be used to fasten other components together. (Figure 5)
Figure 5 | Pawl |
|
|
|
|
12 - 40 mm Plow Bolt 12 - 35mm Plow Bolt
8.At this point the bottom shipping frame should be removed so as not to interfere with installation of the gearbox skid and swathboard. Save the fasten- ers removed from the bottom of the cutter bar as they will be used later at the same location.
9.Install gearbox skid, then gearbox swathboard using the 12 x 40mm bolt that was left loose previ- ously. Use two bolts at front to connect skid and swathboard. (Figure 6) At the rear side of gearbox, use twisted strut to connect skid and swathboard. (Figure 7)
Figure 6 Swathboard
Skid
Figure 7 Skid Swathboard
Twisted Strut |
12 -30 mm (3)
(Also Bottom Front - Not Seen)
10 x 25 mm
12 - 40 mm
49