Chapter 3: Installation/Removal

3.3.3Installing in the 7C04 or 7C04-R Workgroup SmartSwitch

The 7F06-02 Module is installed in the 7C04 or 7C04-R Workgroup SmartSwitch using the following steps and referring to Figures 3-4 and 3-5.

Notes: The top slot in the 7C04 Workgroup SmartSwitch is reserved for the 7X00 SmartSwitch Module.

The bottom slot in the 7C04-R Workgroup SmartSwitch is reserved for the 7X00 SmartSwitch Module.

Therefore, before installing the 7F06-02 module, attach the wrist strap included with the SmartSwitch or SmartSwitch module by following the instructions printed on the package.

1.As a precaution, power down the MMAC 8 before beginning the installation or removal of any modules. At the very minimum, the 7C04 or 7C04-R must be pulled to disconnect it from the power source. Damage to modules may result if this procedure is not followed.

2.Remove the blank panel covering the slot in which the module will be installed. All other slots must remain covered to ensure proper airflow and cooling.

3.Install the module by sliding it into slots as shown in the appropriate figure. Ensure that the printed circuit board (PCB) is between the card guides, slides in straight, and engages the backplane connectors properly.

4.Using a slotted screwdriver, tighten the top and bottom screws.

7F06-02 FDDI SmartSwitch Interface Module User’s Guide

3-5

Page 23
Image 23
Cabletron Systems FDDI manual Installing in the 7C04 or 7C04-R Workgroup SmartSwitch