11. Cooler and Condenser Tubes: |
|
|
| 18. Optional Compressor Discharge Isolation Valve | ||||||||||
Contact a local Carrier Representative for other |
| and Liquid Line Ball Valve: |
|
| ||||||||||
tube offerings. |
|
|
|
|
| These items shall be | ||||||||
12. Cooler and Condenser Passes: |
|
|
| isolation of the refrigerant charge in the con- | ||||||||||
|
|
| denser for servicing the compressor. |
| ||||||||||
Unit manufacturer shall provide the cooler and/ |
|
| ||||||||||||
| 19. Pumpout Unit: |
|
|
|
|
| ||||||||
or condenser with 1, 2 or 3 pass configuration |
|
|
|
|
|
| ||||||||
on the water side. |
|
|
|
|
| A refrigerant pumpout system shall be installed | ||||||||
13. |
|
| on | the | chiller. | The | pumpout | system shall | ||||||
|
| include a hermetic compressor and drive, inter- | ||||||||||||
Unit manufacturer shall furnish |
| |||||||||||||
| nal | piping, internal wiring, and | motor. Field- | |||||||||||
style | waterboxes on the | cooler | and/or | con- |
| |||||||||
| supplied main power wiring and water piping | |||||||||||||
denser rated at 300 psig (2068 kPa). |
|
| ||||||||||||
|
| shall be required. |
|
|
|
| ||||||||
14. Marine Waterboxes: |
|
|
|
|
|
|
|
|
| |||||
|
|
|
|
| 20. BACnet Communication Option: |
|
| |||||||
Unit | manufacturer | shall | furnish | marine | style |
|
|
| ||||||
| Shall provide factory | installed communication | ||||||||||||
waterboxes on cooler and/or condenser rated |
| |||||||||||||
| capability with | a | BACnet MS/TP | network. | ||||||||||
at 150 psig (1034 kPA). |
|
|
|
| ||||||||||
|
|
|
| Allows integration with | ||||||||||
15. Marine Waterboxes: |
|
|
|
|
| |||||||||
|
|
|
|
| tem or a BACnet building automation system. | |||||||||
Unit manufacturer shall furnish marine style |
| denser for servicing the compressor. |
| |||||||||||
waterboxes on cooler and/or condenser rated | → | 21. Optional Seismic Isolation Package: |
| |||||||||||
at 300 psig (2068 kPA). |
|
|
|
| ||||||||||
|
|
|
| Package shall meet International Building Code | ||||||||||
16. Flanged Water Nozzles: |
|
|
|
| ||||||||||
|
|
|
| and ASCE 7 seismic qualification requirements | ||||||||||
Unit manufacturer shall furnish standard |
| |||||||||||||
| in concurrence with ICC ES AC156 Accep- | |||||||||||||
flanged piping connections on the cooler and/ |
| tance Criteria for Seismic Qualification by | ||||||||||||
or condenser. |
|
|
|
|
|
| ||||||||
17. Hinges: |
|
|
|
|
| nents and Systems. Manufacturer shall provide | ||||||||
Unit | manufacturer | shall | furnish | hinges | on |
| seismic | certificate | from OSHPD | (California | ||||
| only). |
|
|
|
|
|
| |||||||
waterboxes to facilitate tube cleaning. |
|
|
|
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
|
910 | 31 |