Carrier 50CR START-UPCHECKLIST Remove and Store in Job File, I. Preliminary Information

Models: 50CR

1 32
Download 32 pages 7.8 Kb
Page 32
Image 32
START-UP CHECKLIST

50CR

START-UP CHECKLIST

(Remove and Store in Job File)

I. Preliminary Information

MODEL NO.:_________________________________

SERIAL NO.:__________________________________

DATE:_______________________________________

TECHNICIAN:_________________________________

II. PRE-START-UP (Insert checkmark in box as each item is completed)

( ) VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT

( ) REMOVE ALL SHIPPING HOLD DOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS

( ) CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS

( ) CHECK GAS PIPING FOR LEAKS (WHERE APPLICABLE)

( ) CHECK THAT INDOOR (EVAPORATOR) AIR FILTER IS CLEAN AND IN PLACE

( ) VERIFY THAT UNIT INSTALLATION IS LEVEL

( ) CHECK FAN WHEEL, AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW TIGHTNESS ( ) MAKE SURE THAT - (If Applicable) ON 060 SIZE PURON HEATPUMP ONLY, THE TWO WIRE TIES FASTEN

TO THE OUTDOOR COILS AND REVERSING VALVE/ACCUMULATOR HAVE BEEN REMOVED

III.START-UP ELECTRICAL

SUPPLY VOLTAGE __________________________________

COMPRESSOR AMPS_________________________________

INDOOR (EVAPORATOR) FAN AMPS___________

TEMPERATURES

OUTDOOR (CONDENSER) AIR TEMPERATURE ___________DB RETURN-AIR TEMPERATURE ___________DB ___________WB COOLING SUPPLY AIR ___________DB ___________WB HEAT PUMP SUPPLY AIR ___________

ELECTRIC HEAT SUPPLY AIR ___________

PRESSURES

REFRIGERANT SUCTION ___________PSIG SUCTION LINE TEMP*___________

REFRIGERANT DISCHARGE ___________PSIG DISCHARGE TEMP†___________

( ) VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS

*Measured at suction inlet to compressor †Measured at liquid line leaving condenser.

A05306

Copyright 2006 Carrier Corp. S 7310 W. Morris St. S Indianapolis, IN 46231

Printed in U.S.A.

Edition Date: 03/06

Catalog No: 50CR--- 1SI

 

 

 

 

 

 

 

Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.

Replaces: New

32

Page 32
Image 32
Carrier 50CR START-UPCHECKLIST Remove and Store in Job File, I. Preliminary Information, Iii.Start-Upelectrical, Pressures