Contents
Installation Instructions
Table of Contents
Safety Considerations
Electrical Shock Hazard
Equipment Damage Hazard
Introduction
Roof Curb for Small Cabinet Roof Curb for Large Cabinet
Unit Leveling Tolerances
50CR024-036 Unit Dimensions
50CR042-060 Unit Dimensions
Rig and Place Unit
Inspection
Unit Falling Hazard
Property Damage Hazard
Rigging Bracket Under Unit Rain Lip
Electrical Operation Hazard
Select and Install Ductwork
Provide for Condensate Disposal
Typical Installation
Physical Data Unit 50CR
Routing Power Leads Into Unit
Connecting Ground Lead to Ground Screw
Routing Control Power Wires
HIGH-VOLTAGE Connections
Electrical Data-50CR
Electrical Data Legend
Wiring Schematics-50CR Single Phase
Wiring Schematics-50CR Three Phase
Accessory Installation
Line Power Connections
START-UP
PRE-START-UP FIRE, EXPLOSION, Electrical Shock Hazard
Unit Start-Up
Status Code 45, Control Board Test Fault
Status Code 37, Heater Output Sensed on When not Energized
Status Code 44, Motor Communication Fault
Verify Motor Winding Section
Status Code 36, Heater Output not Sensed When Energized
Status Code 41, Blower Motor Fault
Status Code 16, System Communication Fault
Status Code 25, Invalid Motor / Model Selection
Sequence of Operation
Start-Up Adjustments
Check for Refrigerant Leaks
Typical Heat Pump Operation, Cooling Mode
Defrost Control
Electric Heat Pressure Drop Table Small Cabinet
Personal Injury and Unit Damage Hazard
Maintenance
Unit Operation Hazard
Air Filter
Indoor Blower and Motor
Outdoor Coil, Indoor Coil, and Condensate Drain Pan
Outdoor Fan
Indoor Airflow
Pressure Switches
Metering Devices-TXV & Accurater Piston
EXPLOSION, FIRE, Electrical Shock Hazard
High-Pressure Switch
Personal INJURY, Unit Operation Hazard
LOSS-OF-CHARGE Switch
Troubleshooting
START-UP Checklist
System Information
Observe all warnings, cautions, and bold text
Troubleshooting Chart
Troubleshooting Chart Cont’d
Head pressure too low
START-UP Checklist