Carrier 50RLP Loop Supply Water Set Point Screen, System Pressure Set Point Screen

Models: 50RLP

1 28
Download 28 pages 1.7 Kb
Page 25
Image 25
Fig. 11 — Loop Supply Water Set Point Screen

Fig. 11 — Loop Supply Water Set Point Screen

Fig. 12 — System Pressure Set Point Screen

BOILER/HEAT SOURCE CONTROL TYPE — This con- figuration determines how the tower outputs will be controlled. If panels were ordered with the stage output transducers, then tower control type should be set to 0. If the tower outputs will control variable speed tower fans, then the configuration should be set to 1.

Variable speed configuration will control both outputs simultaneously.

Boiler/Heat Source Control Type:

Configuration Units

None

Configuration Range

0 or 1

Default Value

0

GLOBAL SCHEDULE BROADCAST — If desired, the schedules 1 through 18 in the Aquazone™ system control panel may be reconfigured to be schedules 65 through 82 (so that they may be used as global schedules). If this is done, this configuration must be set to 1. Local inputs for overriding zones 1 to 18 or the remote occupancy input will then affect the global schedules 65 through 82. In this condition local override of individual PremierLink™ controllers will not occur since the comfort controller does not respond to the command from any PremierLink controller to override a global schedule. It is recommended to allow the PremierLink controllers to broad- cast global schedules.

25

Page 25
Image 25
Carrier 50RLP installation instructions Loop Supply Water Set Point Screen, System Pressure Set Point Screen