78-6643-01 09/27/99 Cisco 6100 Series System Cables 3
Cisco 6100 Series User Guide 3-3
3.1 NEBS Compliance Cabling Guidelines
Tocomply with NEBS requirements, ensure that all cables are screwed in to the backplane and that
the Champ connectors are tie wrapped. (See Figure3-1.)
Figure 3-1 NEBS Cabling Compliance
Note For additional compliance and safety information, refer to theRegulatory Compliance and
Safety Information for the Cisco 6100 Series System document.
3.2 Direct Connect with a PSC Configuration Cables
In a Direct Connect with a PSC configuration, use only designated cables to connect the MC, the
PSC, and the MDF. This section provides tables and illustrations for the following:
MC to PSC Cables
PSC to MDF Cables
Note Somechassis connectors in the cabling diagrams are not used because they are specific to one
of the other configurations of the Cisco 6100 Series system or because they are reserved for
futureuse.
17092
Tie wrap
Champ connector
screw Champ
connector