-2
Cisco AS5350 Universal Gateway Chassis Installation Guide
78-10754-03 0A
Appendix
Required Tools and Equipment
Warning
Before working on a system that has an on/off switch, turn OFF the power and unplug the power cord.
To see translations of the warnings that appear in this publication, refer to the Regulatory Compliance
and Safety Information document that accompanied this device.
Warning
Before working on equipment that is connected to power lines, remove jewelry (including rings,
necklaces, and watches). Metal objects will heat up when connected to power and ground and can
cause serious burns or weld the metal object to the terminals. To see translations of the warnings that
appear in this publication, refer to the Regulatory Compliance and Safety Information document that
accompanied this device.
Warning
Only trained and qualified service personnel should be allowed to install or replace this equipment.
To see translations of the warnings that appear in this publication, refer to the Regulatory Compliance
and Safety Information document that accompanied this device.
Warning
This product relies on the building's installation for short-circuit (overcurrent) protection. Ensure that
a UL Listed and Certified fuse or circuit breaker no larger than 60 VDC, 15 A is used on all
current-carrying conductors. To see translations of the warnings that appear in this publication, refer
to the Regulatory Compliance and Safety Information document that accompanied this device.
Caution Before opening the chassis, ensure that you have discharged all st atic electricity from your body and be
sure that the power is off.
Required Tools and Equipment
You need the following tools and equipment:
Medium-size Ph ill ip s s c rewd r iver
Small or medi um fl at-blade screwd rive r
ESD-preventive wrist st rap
Tie-wraps (optional)
Antistatic bag (optional)