![](/images/new-backgrounds/1170300/170300305x1.webp)
Chapter 4 Installation in a Hazardous Environment
Verifying Switch Operation
Figure 4-2 Stripping the Ground Wire
1
2
3
104908
1
2
0.5 inch (12.7 mm) ± 0.02 inch 3 Wire lead (0.5 mm)
Insulation
Step 3 Insert the ground wire into the ring terminal lug, and using a crimping tool, crimp the ring terminal to the wire.
Figure 4-3 Crimping the Ring Terminal
| 76666 |
Step 4 | Slide the ground screw through the ring terminal. |
Step 5 | Insert the ground screw into the functional ground screw opening on the front |
| panel. |
|
| Catalyst 2955 Hardware Installation Guide |
|
|
|
|
| ||
|
|
|
| |
|
|
|