Ensurethat circuits are sized according to local and national codes. For North America, the power supply
requires a 20 A circuit.
Toprevent loss of input power, ensure that the total maximum loads on the circuits supplying power to
the chassis are within the current ratings for the wiring and breakers.
Use the following torque values when installing the chassis:
10-32 screws: 20 in-lb
Required Equipment
Before you begin the installation, ensure that you have the following items:
Number 1 and number 2 Phillips-head screwdrivers with torque measuring capabilities
Tapemeasure and level
ESD wrist strap or other grounding device
Antistatic mat or antistatic foam
Unpacking and Inspecting the Chassis
When handling chassis components, wear an ESD strap and handle modules by the carrier edges only.Caution
Keep the shipping container in case the chassis requires shipping in the future.Tip
The chassis is thoroughly inspected before shipment. If any damage occurred during transportation or any
items are missing, contact your customer service representative immediately.
Note
Procedure
Step 1 Remove the chassis from its cardboard container.Save all packaging material.
Step 2 Compare the shipment to the equipment list provided by your customer service representative and verify that
you have received the following items:
Any printed documentation
Tool-lessrack-mount kit (N20-CRMK2=)mounting rails can be installed in a rack without the use of
tools. The optional round hole adapter kit (N20-CRMK2-RHA=) does require tools.
ESD wrist strap
Cables with connectors (including the N20-BKVM=, which is the KVM/local I/O console dongle)
Cisco UCS 5108 Server Chassis Installation Guide
OL-20035-05 5
Installation
Required Equipment