Chapter 2 - Mounting Instructions

6

Parts and Tools

The following items are needed to install the mounting ears and handles on the IntraPort Enter- prise-8 VPN Access Server.

IntraPort Enterprise-8 unit

Two mounting ears

Two handles

Two handle spacers

14 mounting screws (10-32 undercut flat head)

Phillip’s head screwdriver

In addition to the above items, the following items are needed to install the IntraPort Enter- prise-8 VPN Access Server in an equipment rack.

One left rack-mount bracket

One right rack-mount bracket

One DB-25 male to DB-25 female console cable

Tape measure (optional)

Level (optional)

Your own screws or clips, for fastening the brackets to the rack

At least two people to lift the device into place. Do not attempt to move the device into the rack or onto a table or platform by yourself.

Changing the Power Supply Voltage Settings

The default setting for the voltage switches on the server’s power supplies is for a low input voltage (marked 115V on the switch). If your electrical system requires a high input voltage on the power supplies, you must change it manually on the device before plugging the device in.

To change the settings:

1.Make sure the server is powered down and not connected to any power source.

2.Using a small screw driver, change the voltage switches to the desired setting (230V for high input voltage, 115V for low input voltage).

Figure 1. Location of Voltage Switch on the Power Supply

Page 12
Image 12
Compatible Systems A00-1869, Enterprise-8 manual Parts and Tools, Changing the Power Supply Voltage Settings