Manuals
/
Daewoo
/
TV and Video
/
VCR
Daewoo
VCR MECHANISM UNIT
service manual
Wire Diagram Connector Pin Arrangement
Models:
VCR MECHANISM UNIT
1
6
34
34
Download
34 pages
36.98 Kb
3
4
5
6
7
8
9
10
<
>
Parts list
Assembly Diagram and A/S
Deassembly and Replacement
Deassembly of Drum Ass’y Fig
Mechanical Adjustment
Cleaning
Page 6
Image 6
WIRE DIAGRAM
1. Wire Diagram
2. Connector Pin Arrangement
5
Page 5
Page 7
Page 6
Image 6
Page 5
Page 7
Contents
VCR Mechanism Unit
Contents
Assembly Diagram and A/S
Assembly diagram Deck Assembly diagram A. Upper View
Lower View
Front Loading Assembly diagram
Wire Diagram
Wire Diagram Connector Pin Arrangement
Periodic Maintenance and Service Schedule
Periodic Maintenance and Service Schedule
Service Schedule for the Major Parts
Service Schedule for the Major Parts
Jigs and Tools
List of Jigs and Tools
Sketch of Jigs and Tools
Deassembly and Replacement
Deassembly of Front Loading Ass’y .2~3.5
Removal of the Front Loading Ass’y Fig
Deassembly of Drum Ass’y Fig
Deassembly of the Cassette Holder Ass’y
Deassembly of the A/C Head ASS’Y Fig
Deassembly of the Loading RACK, Loading
Deassembly of the CAM GEAR, Relay LEVER, FL Rack Fig
10 Deassembly of the LC Bracket ASS’Y from
Deassembly of the Tension Band ASS’Y Fig
Deassembly of the Capstan Motor Fig
Deassembly of the FE Head Fig
Deassembly of the Reel Brkt Total ASS’Y, Connect Plate Fig
Deassembly of the Reel TABLE, Idler Plate Total ASS’Y Fig
Mechanical Adjustment
Mechanical Adjustment .1~4.4
Adjustment and measurement of the Back Tension .5
Assembly reference between the Loading Rack
Mechanical Mode Operate without a cassette tape
Adjustment of the position of the Tension Pole Fig
Adjustment of the Tpae Transporting Section
A schematic diagram of the tape transporting section
Adjustment of the Tpae Transporting System
Cleaning
Adjustment of the AC Head HeightFig
Adjustment of the S/T Guide Roller
Adjustment of the AC Head ASS’YTILT
Adjustment of the Audio AZIMUTHFig
Playback Phase ADJUSTMENTFig
Adjustment of the LINEARITYFig
Adjustment of the wave form of Drum Entrance / Exit Fig
Review
Adjustment of the Audio Azimuth
Position
Exploded View and Parts List
Exploded view of Deck Ass’y Top View
Exploded view of Deck Ass’y Bottom View
Exploded view of FL Ass’y
D0040 D0020 D0050 D0010 D0060 D0070
Exploded view Drum Total Ass’y
LOC Part S/N Part Name Part Discription Ntsc M1OOO
Parts List of Deck Total Ass’y continud
Parts List of Deck Total Ass’y
LOC Part S/N Part Name Part Discription Ntsc
Mail G7F00E@web.dwe.co.kr TEL FAX
Top
Page
Image
Contents