DEASSEMBLY AND REPLACEMENT (CONTINUED)

4.Deassembly of LOADING RACK, LOADING ASS’Y, S/T SLANT POLE ASS’Y (Fig. 3.7, 3.8)

a.Turn out the DECK MECHANISM and remove the LOADING RACK@after unscrewing the SCREW !.

b.Disintegrate the R LOADING AS #and L LOADING AS $.

c.Disintegrate the S SLANT POLE AS %and T SLANT POLE AS ^by moving those part in arrow direction.

CAUTION:

Take care GUIDE ROLLER of S/T SLANT POLE AS and SLANT POLE not to be stained with grease during assembly.

Refer to Fig. 3.8 in assembly.

FIg. 3.7 Deassembly of the LOADING RACK, LOADING

ASS’Y and the SLANT POLE ASS’Y

FIg. 3.8 Assembly of the L/R LOADING AS and the

LOADING RACK

5. Deassembly of the A/C HEAD ASS’Y (Fig. 3.9)

a.Remove the CONNECTOR @from the AC HEAD Ass’y, watch out that there is no damage in the HEAD connecting PIN.

b.Separate the AC HEAD Ass’y !after unscrewing the screw #.

CAUTION:

After the assembly, adjust the tape transmission section by refering to the chapter 5.

After the adjustment of the tape transmission section, paint the 3 adjustment screw with locking paint.

FIg. 3.9 Deassembly of the AC HEAD ASS’Y

12

Page 13
Image 13
Daewoo VCR MECHANISM UNIT service manual Deassembly of the A/C Head ASS’Y Fig, Deassembly of the Loading RACK, Loading