Dansons Group CCGB 1, CCGB 2 manual Planning & Installation Check List, Glow Boy Home & Shop Heater

Models: CCGB 1 CCGB 2

1 40
Download 40 pages 57.49 Kb
Page 9
Image 9
PLANNING & INSTALLATION CHECK LIST

PLANNING & INSTALLATION CHECK LIST

Unless you are knowledgeable and experienced in stove installation, we recommend your Glow Boy Appliance receive a Pre-delivery Check and be installed by your local Specialty Retailer, NFI (National Fireplace Institute) Pellet Specialist (USA) or WETT Certified Installer (CAN) .

COMPLETE THIS CHECK LIST PRIOR TO INSTALLING YOUR MULTI-FUEL APPLIANCE:

_____

Carefully read this "Owners Manual”. SAVE THIS MANUAL.

_____

Have your local Dealer demonstrate all the operational, cleaning and maintenance steps

 

necessary for your stove.

_____

Select a location. The design of your home and the stove placement will determine its value

 

as a source of heat. A pellet appliance depends primarily on air circulation to disperse its

 

heat. There are other practical considerations, which must be considered before a final

 

placement is decided on:

 

Existing Chimneys, Pellet Fuel Storage, Aesthetic Considerations, Roof Design (rafter

 

locations & roof pitch), Room Traffic, Clearances to Combustibles, and Existing Wiring.

_____ The installation of this appliance must conform to local codes and applicable state and

 

federal requirements. Becoming familiar with these requirements before installation is

 

essential.

_____

Sign and keep a copy of the Pre-delivery Check List supplied by your Authorized Dealer, OR

 

“Dansons Certified Installer”, found inside our appliance or available online.

______

Attach your proof of purchase to this manual and keep on hand for warranty.

COMPLETE THIS CHECK LIST WHILE INSTALLING YOUR MULT—FUEL APPLIANCE:

_____

Carefully read the ENTIRE installation section first.

Twice is better.

_____

Read the Installing Freestanding, Insert or Built-In

sections.

_____ Determine the location and measurement needed your chosen location.

_____ Be sure to pre-fitall items before you install, fasten or install the stove permanently.

Remember measure twice, cut once.

_____ Ensure ALL joints of “PL” vent and single wall stainless steel liner are tightly connected,

sealed with RTV Silicone or Hi-Temp foil tape, including to the exhaust connector, and is correctly installed. (Follow vent manufacturer’s instructions.)

COMPLETE THIS CHECK LIST PRIOR TO LIGHTING YOUR FIRST FIRE:

_____

Obtain final inspection and approval by local building officials.

 

_____

Carefully clean all marks off the brass, nickel or pewter parts before the first fire is lit. Use a

 

 

soft cloth and a gentle type cleaner. Caution: Never use an abrasive cleaner on any part of your

 

 

stove.

 

 

_____

Polish the hopper to remove the oil type coating used in manufacturing.

 

_____ The high temp. stove paint used on your stove may take several hours of burning at a high fuel

 

 

setting to fully cure. During this time an odor, which is not harmful, may be evident. The area

 

 

around the stove should be well ventilated.

 

 

_____ Review and follow the Lighting and Controls Instructions.

 

_____

Ensure that appliance is connected to a surge protection unit.

 

_____

Fill the hopper with quality pellets, Close the Hopper Lid, Using the CCI “AcuTron”,

 

(figure 5), PUSH the FEED RATE Touch Pad and this will start the auger and the combustion fan.

 

 

 

 

 

 

Glow Boy Home & Shop Heater

www.glowboystoves.com

9

 

 

 

 

Page 9
Image 9
Dansons Group CCGB 1, CCGB 2 manual Planning & Installation Check List, Glow Boy Home & Shop Heater