Primary Piping
• Size primary manifold for total flow of all circula- tors
• Size each circulator to individual circuit require- ments
• Install balancing valves to adjust flow to distribute heat to all zones
Fig. 12: Primary piping - Zoning with Circulators
• Install balancing valves to adjust flow to distribute heat to all zones
Fig. 13: Primary Piping - Zoning with Zone Valves
1. | Appliance circulator | 5. System purge valve |
2. | 6. System circulator | |
3. | Flow check valve |
|
4. | Zone valve | Note: See page 23 for near appliance piping. |
24