Primary Piping

• Size primary manifold for total flow of all circula- tors

• Size each circulator to individual circuit require- ments

• Install balancing valves to adjust flow to distribute heat to all zones

Fig. 12: Primary piping - Zoning with Circulators

• Install balancing valves to adjust flow to distribute heat to all zones

Fig. 13: Primary Piping - Zoning with Zone Valves

1.

Appliance circulator

5. System purge valve

2.

Shut-off valves

6. System circulator

3.

Flow check valve

 

4.

Zone valve

Note: See page 23 for near appliance piping.

24

Page 30
Image 30
Delta PG PLUS-25 warranty Primary piping Zoning with Circulators