SECTION XIII- Check-Out Procedures
NOTICE
Perform the following
Both inner and outer tanks filled with water.
Water chemistry checked and verified as outlined on page 47.
The automatic air vent on the unit and any place within the system are open one full turn.
Air is purged from the heating zones and primary system.
Domestic piping is purged of air and has been checked for leaks.
Burner has been confirmed as properly configured for Propane application. (If applicable).
Thermostat circuit wiring checked and verified that no voltage is present to the Room Thermostat
Operating Instructions on page 52 were followed during
Combustion levels and flame pattern verified as outlined on page 53.
Measure the rate of input on Natural Gas as outlined on page 53.
Check the incoming gas pressure to ensure a minimum pressure of 5”w.c during flow conditions to all gas appli- ances and a maximum pressure of
13”w.c during
Primary and Secondary Thermostat properly set as shown in Figure 38 and 39 page 54.
The thermostatic mixing valve adjusted to the desired domestic hot outlet tem- perature.
Adjusted balancing valves and system limit controls to provide design temper- atures to the primary space heating sys- tem.
In multiple zone applications, adjusted for correct flow of primary heating water to each zone.
Check and verified room thermostat function properly and the thermostat heat anticipator (if used) was properly set.
Observed several operating cycles for proper operation of the PERFOR- MANCE PLUS and the system.
Set the room thermostat(s) to the desired room temperature.
Reviewed all instructions shipped with the PERFORMANCE PLUS with the homeowner or maintenance personnel.
Complete the Installation Record on page 57.
Ensure all manuals and other documen- tation are returned to the Installation envelope and given to the owner for safekeeping.
56