Cathedral Ceiling Installation

VENTING INSTALLATION

Installation for Vertical Termination (Cont.)

17

VENTING INSTALLATION

Continued

6.Continue to add pipe sections until the height of the vent cap meets the minimum building code requirements described in Figure 20 on page 11. Note: You must increase vent height for steep roof pitches. Nearby trees, adjoining rooflines, steep pitched roofs, and other similar factors may cause poor draft or down-drafting in high winds. Increasing the vent height may solve this problem.

7.Twist-lock the vent cap onto the last section of vent pipe and seal outer pipe connection with high temperature silicone seal- ant as specified in the second warning statement on page 12.

Note: If the vent pipe passes through any occupied areas above the first floor, including storage spaces and closets, you must enclose pipe. You may frame and sheetrock the enclosure with standard construction material. Make sure and meet the minimum allowable clearances to combustibles. Do not fill any of the required air spaces with insulation.

Cathedral Ceiling Installation

1.Remove shingles or other roof covering as necessary to cut the rectangular hole for the support box. Mark the outline of the cathedral ceiling support box on the roof sheathing using the locating hole as a center point.

2.Cut the hole 1/8" larger than the support box outline (see Figure 33).

3.Lower the support box through the hole in the roof until the bottom of the box extends at least 2" below the ceiling (see Figure 33). Align the support box vertically and horizontally using a level. Temporarily tack the support box in place through the inside walls and into the roof sheathing.

4.Using tin snips, cut the support box from the top corners down to the roofline and fold the resulting flaps over the roof sheath- ing (see Figure 34). Apply a bead of nonhardening mastic around the top edges of the support box to make a seal between the box and the roof. Nail in place with roofing nails. Remove any com- bustible material that might be inside of the support box.

5.Complete the cathedral ceiling installation by following the same procedures outlined in steps 2 through 7 for Flat Ceiling Instal- lation, page 16.

LevelVertical Termination ConfigurationsVenting with Two 90° Elbow

Cathedral Ceiling

Manual background Support Box

2" minimum below finished ceiling

Cut hole 1/8" larger than support box when projected onto roofline

Figure 33 - Cathedral Ceiling Support Box Installation

Nonhardening mastic under all edges of support box before nailing

Figure 34 - Installed Cathedral Ceiling Support Box

Vertical Termination Configurations

Figure 35 through 38 show four different configurations for vertical termination. All connections must be sealed with high temperature silicone sealant as specified in the second warning statement on page 12.

Venting with Two 90° Elbow

Vertical (V)

Horizontal (H)

5' min.

2' max.

6' min.

4' max.

7' min.

6' max.

8' min.

8' max.

20' max.

8' max.

Note: Install restrictor into 4" collar of burner system as shown.

Figure 35 - Vertical Venting Configuration Using Two 90° Elbow

For moreManual backgroundManual backgroundManual backgroundManual backgroundvisit www.Manual backgroundManual backgroundManual background.comManual backgroundManual backgroundManual backgroundManual backgroundManual background

112126-01B

Page 17
Image 17
Desa SDVBPD, SDVBND Venting Installation, Continued, Cathedral Ceiling Installation, Vertical Termination Configurations