12

VENTING INSTALLATION INSTRUCTIONS Installation Planning (Cont.) Installation for Vertical Termination

VENTING INSTALLATION

INSTRUCTIONS

Continued

Venting with Two 90° Elbows

 

Horizontal (H1) +

Vertical (V)

Horizontal (H2)

5' min.

6' max.

6' min.

12' max.

7' min.

18' max.

8' min.

20' max.

20' max.

20' max.

45° Elbow

Figure 18 - Horizontal Termination Configuration for Venting Using Two 90° Elbows with Termination at 90° with Fireplace

INSTALLATION FOR VERTICAL TERMINATION

Note: Vertical restrictor must be installed in all vertical installations.

1.Determine the route your vertical venting will take. If ceiling joists, roof rafters or other framing will obstruct the venting system, consider an offset (see Figure 19) to avoid cutting load bearing members. Note: Pay special attention to these installation instructions for required clearances (air space) to combustibles when passing through ceilings, walls, roofs, enclosures, attic rafters, etc. Do not pack air spaces with insu- lation. Also note maximum vertical rise of the venting system and any maximum horizontal offset limitations.

2.Set the fireplace in desired location. Drop a plumb line down from the ceiling to the position of the fireplace exit flue. Mark the center point where the vent will penetrate the ceiling. Drill a small locating hole at this point.

Drop a plumb line from the inside of the roof to the locating hole in the ceiling. Mark the center point where the vent will penetrate the roof. Drill a small locating hole at this point.

Roof Flashing

Wall Strap

45° Elbow

Ceiling Firestop

Figure 19 - Offset with Wall Strap and 45° Elbows

www.desatech.com

116647-01A

Page 12
Image 12
Desa (V)T32EN-A Series, (V)T32EP-A Series installation manual Installation for Vertical Termination, Horizontal H 1 +