SNORKEL TERMINATION INSTALLATION Recommended Applications:
• Installations requiring a vertical rise on building exterior
• Any installation using snorkel termination to achieve one foot above ground

Venting Installation instructions

Continued

CORNER INSTALLATION

Recommended Applications:

Corner ground floor installation

Ground floor installation where pipe vents horizontally through wall (over 12" horizontal pipe)

Basement installation where one foot clearance from ground to termination is possible

 

 

Not to Exceed

90° Elbow

Not to Exceed

 

Square

(H) Limits

 

As Required

(H) Limits

 

 

 

90°

 

Termination

 

for (V), See

 

 

Elbow

 

 

 

 

Chart for

 

 

 

 

 

 

 

 

 

Pipe Section

 

 

 

 

 

Required

 

 

 

 

 

 

Wall

 

 

 

 

 

Firestop

Wall

 

45°

 

 

 

Firestop

 

 

 

Elbow

 

 

45°

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Elbow

 

 

 

 

Vertical (V)

Required

 

 

Vertical (V)

Vertical Pipe

Horizontal (H)

 

 

*43 3/4" min.

None

30" max.

 

 

53 3/4" min.

1 ft.

48" max.

 

 

65 3/4" min.

2 ft.

60" max.

 

 

77 3/4" min.

3 ft.

84" max.

 

 

89 3/4" min.

4 ft.

20' max.

* Ground Floor Corner Venting

Square Termination

12" Min.

Figure 15 - Horizontal Termination Configuration for Corner Installation Using One

90° Elbow

Snorkel terminations are available for installations requiring a vertical rise on the exterior of the build- ing. If installing snorkel termination below grade, you must provide proper drainage to prevent water from entering snorkel termination (see Figure 16). Do not back fill around snorkel termination.

Snorkel

Termination

12" Min.

Snorkel

Termination Wall

Firestop

90° Elbow

12" Min.

Adequate

Drainage

Snorkel

Termination

12" Min.

Figure 16 - Snorkel Termination Configurations for Below Ground Installation

12

www.desatech.com

116647-01B

Page 12
Image 12
Desa (V)T32EP-A SERIES, (V)T32EN-A SERIES Wall Firestop Elbow, 43 3/4 min None, 53 3/4 min, 65 3/4 min, 77 3/4 min