Initial Startup

2003 Sarena Bay

Export Owner’s Manual

Initial Startup

1.Locate the Top Side Control.

2.Locate the hose bib that is included in the owner’s manual packet. The owner’s manual packet is shipped inside the equipment compartment. Your dealer should provide you with this packet during installation.

3.Locate the male fitting at the bottom of the lower left corner of the hot tub – below the skirt on the left corner of the side containing the Top Side Control.

4.Close the valve on the side of the hose bib and screw it onto the end of the hose bib. Check to ensure the cap on the hose bib is secure to avoid leaks when you add water to the spa.

5.Remove the panels below the Top Side Control and the right side to expose the pumps and the Lower Equipment Compartment.

6.There are two pump unions and two gate valves per pump. The pump on the left in the picture shows the typical locations of the pump unions and gate vavles. Check to make sure the pump unions are hand tight to prevent the possibility of leakage. Next, check the gate valves to make sure they are fully opened and that the red safety clips are snapped into place. The other pumps in the picture are identified by the additional circles. Be sure to check the pump unions and gate valves for all three pumps..

7.After you finish checking the pump unions

and gate valves, remove the shipping bolts from the base of each pump.

8.Next, check the fittings on the two circulation pumps located at the bottom of the Lower Equipment Compartment to make sure they do not leak.

17

Page 23
Image 23
Dimension One Spas Sarena Bay manual Initial Startup